Bio Energizer® Cuts Sludge Hauling Costs for Potato Wastewater Treatment Plant

Potato Wastewater TreatmentA wastewater treatment plant in Pennsylvania was experiencing process control problems when new potato waste stream flows increased by 26%. The additional load was causing filamentous issues in the sequencing batch reactor (SBR), settlability problems, and increased sludge hauling costs.

The engineer was unable to maintain the 8-foot decant level in the sequencing batch reactor (SBR). He couldn’t decant more than 2–3 feet under the excess load.
Read more about reducing sludge handling costs

Translate »
>