Bio Energizer® Cuts Sludge Hauling Costs for Potato Wastewater Treatment Plant

Potato Wastewater TreatmentA wastewater treatment plant in Pennsylvania was experiencing process control problems when new potato waste stream flows increased by 26%. The additional load was causing filamentous issues in the sequencing batch reactor (SBR), settlability problems, and increased sludge hauling costs.

The engineer was unable to maintain the 8-foot decant level in the sequencing batch reactor (SBR). He couldn’t decant more than 2–3 feet under the excess load.
Read more about reducing sludge handling costs

Bio Energizer® Reduces Cost and Turbidity in Paperboard Lagoons

BOD & COD Discharges in Paperboard Lagoon

A paper mill wastewater facility was treating 940 tons of paper bags, recycled linerboard, and corrugating medium, daily. The mill was interested in improving wastewater operating efficiency and lowering operating expenses over their standard polymer usage. The plant was experiencing filamentous bacteria, solids, and bulking issues in the final clarifier. It was discharging 4,000 pounds of fiber per day into the Ohio river. Read more about reducing cost and turbidity

Translate »
>